Client: Bank of England

Project: 20 Moorgate

Duration: 12 weeks
Electrical validation covering:

Stage 1 validation:

  • Desktop study of the building documentation
  • HV and LV Switch Gear and distribution validation
  • Oil and Water Leak Detection Systems
  • Lightening Protection

Stage 2 Validation

  • NIC EIC Fixed Electrical Installation
  • Periodic Inspection and Testing Condition Report to BS 7671:2008(2011)
  • Protection and Discrimination Study

We were engaged by Long and Partners commissioning division COMCO to undertake the electrical validation at 20 Moorgate and provide comprehensive Report of the condition of the existing service installations in view of future serviceability and equipment/components life span expectancy. The Report information was a key requirement for the client`s consultant and project team as to provide background information regarding design and pending fit out works plus future maintenance.

As part of our services:

  • Electrical Installation Periodic Inspection and Testing
  • Emergency Lighting Periodic Inspection and Testing
  • Validation Reports
  • Discrimination Studies
  • Power Quality Analysis
  • Load and Power Consumption Analysis
  • Thermal Imaging Surveys
  • HV & LV switch Gear Service and Surveys
  • AMT metering systems implementation
  • Electrical Installations Design and Project installation works