Client: Anderson Wilde and Harris

Project: Balham Hill

Duration:35 weeks

A full design and build package to build 8 flats over the top of an existing structure, which was also a grade 2 listed building. This was to be completed with the tenants in occupation.

The works involved the removal of the existing roof covering and the construction of a new steel frame structure above the existing building. Construction of a new mansard roof and the internal fit out of 8 flats was also included. Completion scheduled for May 2016.