Value – £3 Million
Duration – 16 Weeks
Client – Benesco Charity
Project Description
Polyteck undertook a CAT A fit-out and carried out a rear extension using steel frame and Metsec lightweight steel system over 3 floors.
Description of activity required
- Renewal of windows including new full height windows to ground floor
- Existing dormas removed/replaced with new windows and levelling vertical façade
- Roof survey with roofing works as recommended
- New lift/motor installed into existing shaft and motor room
- Floors stripped out/remodelled to new raised floor layout
- Common parts and reception remodelled
- Full redecoration
- New M&E services designed/installed using performance specification