Embassy Court

Project: East Barnet Duration: 26 weeks Value: £2M Phase 1 – £1.0M Programme – 26 weeks Polyteck agreed with the freeholder to develop a new mansard construction to the roof of Embassy Court over the existing 4-floor block adjacent to Bounds Green Station. The Mansard construction will comprise 4 penthouse apartments, the common parts will…

The elements of Building Refurbishment

Why refurbish your building? Nothing lasts forever and your building is certainly no different. From broken windows, burnt-out lights or peeling paint, your building is not getting any younger and the perception of your business can make all the difference to your employee motivation to winning new projects. Interior design as well as architectural landscaping speaks volumes…

Is Your Building Fire Safe?

Fire alarms are positioned in every building because they save people’s lives. They generate sound when they detect the presence of a fire (some via heat and others via smoke), so that even if you can not physically see the flames, you have time to react. Everyone should be aware of the procedures involved when…

Balham Hill

client: Anderson Wilde and Harris project:  Balham Hill duration:  35 weeks value: £2M   A full design and build package to build 8 flats over the top of an existing structure, which was also a grade 2 listed building. This was to be completed with the tenants in occupation. The works involved the removal of the existing roof covering…